Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Costa Rica retreated: Paradise of wellness in Central America
    • Lower Myra Falls Hike, which is inevitable in StrateCona Provincial Park Park
    • How to lift the hole in the wall trail near Port Alberani, BC
    • Nice giants and fast collapses: herb animals in Tanzania
    • 3 days in Santorini – the best things to see and do
    • Children’s animals in Tanzania: A video article from Tarangy, Nugurongoro, and Serinjiti
    • This professional traveler reveals how to tour the world without any remorse
    • Spring of 2025 external equipment and new books guide
    Facebook X (Twitter) Instagram
    ZEMS BLOG
    • Home
    • Sports
    • Reel
    • Worklife
    • Travel
    • Future
    • Culture
    • Politics
    • Weather
    • Financial Market
    • Crypto
    ZEMS BLOG
    Home ยป Work is scheduled to begin in the near future on improvements to the area park
    Future

    Work is scheduled to begin in the near future on improvements to the area park

    ZEMS BLOGBy ZEMS BLOGFebruary 7, 2024No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Improvements will begin soon at Bethlehem Park, as a result of the Alexander County Board of Commissioners approving bids at its latest meeting, held Monday (Feb. 5).

    The total cost of the project is $2,355,000, including $1,295,000 for construction, which will be done by Lail Builders, Inc., $510,000 for lighting, which will be installed by Camp Electric, and $280,000 for lighting, which will be installed by Camp Electric, County Administrator Shane Fox said. For the new playground, which is being built by Carolina Parks and Play, $270,000 for engineering to be provided by West Consultants, and contingencies. The project will be funded with $750,000 in state funds and $1,605,000 in Section 44 sales tax money, with no local general fund tax money used, he said.

    County Manager Fox said the project will include a new restroom/concession/picnic building, a new playground, renovation of two tennis courts, conversion of two tennis courts into eight pickleball courts, two half-court basketball play areas, and new lighting with steel poles. LED lights, conversion of the large baseball field into a soccer field, new baseball/softball batting cages, new ADA sidewalks and driveways, parking lot resurfacing, drainage improvements, and more.

    The current structure at Bethlehem Park is 36 by 24 feet, while the new structure will be 96 by 30 feet with double the number of bathrooms, two dining areas, a new kitchen area, two service windows and picnic areas on both sides. The new playground will replace the existing play area, with areas for ages 0-5 and 5-12, including swings, slides, sensory areas, nature features and more. The playground will have a 20-year warranty. Bethlehem Park, about 13 acres, has been managed by Alexander County since the 1970s. The last major update to the shelter and playground was done in the 1990s. The new project should take 240 days to complete.

    [Story courtesy of Rick Gilbert, WACB]

    Source link

    ZEMS BLOG
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleTaco Bell parent Yum Brands' stock fell after losing fourth-quarter earnings
    Next Article Weather forecast for Wednesday, February 7, 2024
    ZEMS BLOG
    • Website

    Related Posts

    Tim Berners-Lee makes predictions for the future

    March 12, 2024

    Response may bias understanding of future scenarios

    March 12, 2024

    Pioneering the future of defense technology through pioneering innovations

    March 12, 2024
    Leave A Reply Cancel Reply

    Costa Rica retreated: Paradise of wellness in Central America

    July 8, 2025

    Lower Myra Falls Hike, which is inevitable in StrateCona Provincial Park Park

    June 30, 2025

    How to lift the hole in the wall trail near Port Alberani, BC

    June 26, 2025

    Nice giants and fast collapses: herb animals in Tanzania

    June 23, 2025
    Recent Posts
    • Costa Rica retreated: Paradise of wellness in Central America
    • Lower Myra Falls Hike, which is inevitable in StrateCona Provincial Park Park
    • How to lift the hole in the wall trail near Port Alberani, BC
    • Nice giants and fast collapses: herb animals in Tanzania
    • 3 days in Santorini – the best things to see and do
    About

    ZEMS BLOG in partnership with Holiday Omega keeps you informed. Bringing you the latest news from around the world with fresh perspectives and unique insights. Your daily source for news from around the world. All perspectives, all curated for a global audience.

    Facebook X (Twitter) Instagram YouTube Telegram
    • About Us
    • Contact Us
    • Privacy Policy
    • Disclaimer
    Subscribe For latest updates

    Type above and press Enter to search. Press Esc to cancel.